The utility proposed the addition of 2.3 GW of renewables for the upcoming 3-year Integrated Resource Plan period, along with contracting more than 2.3 GW of natural gas from existing natural gas resources.
The utility proposed the addition of 2.3 GW of renewables for the upcoming 3-year Integrated Resource Plan period, along with contracting more than 2.3 GW of natural gas from existing natural gas resources.