PJM triples annual load growth forecast to 2.4% driven by data centers, electrification
The PJM Interconnection’s fastest-growing zones include ones served by Dominion Energy and FirstEnergy’s Metropolitan Edison and Jersey Central Power & Light utilities, per the grid operator’s load forecast.