Colorado regulator’s vision for Xcel virtual power plant: Tariff-driven, 50 MW and online by this fall
The virtual power plant pilot would include an opt-in “prosumer tariff” with higher fixed costs and a lower volumetric rate designed to incentivize distributed energy resource investment.