D.C. Circuit rejects Entergy, Xcel bid to overturn FERC ruling on MISO transmission cost allocation
The court upheld the Federal Energy Regulatory Commission’s cost-sharing decision for certain transmission projects between the Midcontinent Independent System Operator and the PJM Interconnection.